February 18

02-18-2022Church Building Update

The team has been working on many other items in addition to the construction process.

  • The Altar and Ambo have been designed and a vendor selected
  • The main Crucifix has been designed and a vendor selected
  • The pews have been designed and a vendor selected
  • The 30 stained-glass windows and four transept entry art glass has been designed and a vendor selected
  • The large St. Benedict bronze statue in front of the building has been designed and is in the process of being quoted
  • The Stations of the Cross for the Nave have been designed and a vendor selected
  • The sound system has been designed and a vendor selected
  • The projection system has been designed and a vendor selected
  • The live-streaming system has been designed and a vendor selected
  • Working on the tabernacles for the main Worship Space and the Chapel
  • Beginning work on the Baptismal font
  • Beginning work on the security system

The Chapel

  • The main Altar and Ambo are in the design process
  • The chairs have been designed and in negotiations with vendor
  • The Crucifix has been designed and in negotiations with vendor
  • The existing Stations of the Cross will be utilized in the Chapel

The asbestos report from the lab came back clear of asbestos. Final site updates have been uploaded to the City of Phoenix. The changes required by the City for the building permit will be submitted on Monday.

Any questions please reach out to Bob Prezkop at bprezkop@stbenedict.org.

BACK TO LIST