11-11-2022Church Building Update

Concrete has been poured for the elevated cry room and ramp, along with the floor of the Narthex where the footings have been installed. The floor of the choir loft and the stairs have been poured in preparation of the final flooring. Next week the lower Sanctuary is scheduled to be poured, including the ramp to the Sanctuary. The north transept is also scheduled to be poured.

The mason continues with the construction. The bell tower is at a current height of 40 feet, with 34 more feet to be added. The masonary work on the west end to enclose the building will continue as the concrete areas are poured.

Photos for this week:

  • The bell tower with the arches on the east side of the building.
  • The elevated cry room with the ramp.
  • The preparation of the area for the ramp to the Sanctuary.